View Single Post
  #8  
Old 01-12-2021, 03:57 PM
Ambush Ambush is offline
Senior Member
 
Join Date: Nov 2020
Location: British Columbia
Posts: 608
Default

The angle will get welded to the tube and bolted to the frame flange. I'll predrill as many holes as possible before its too cumbersome to put under the drill press. I'm hoping to have the dry fit done, tacked together and flange holes all drilled this afternoon. Then I have to go looking for some plate to go from the angle to the tractor frame. I want that part bolted together to simplify removal if need be. It's more work now, but likely far less problematic in the long run. It's always tempting to just grab the welder and make some "instant" bolts.
Attached Images
File Type: jpg IMG_2208.jpg (15.0 KB, 541 views)
File Type: jpg IMG_2205.jpg (17.2 KB, 535 views)
File Type: jpg IMG_2206.jpg (18.2 KB, 538 views)
Reply With Quote