Haven't been getting the time in on the loader that I should, but I am still getting some stuff done. The boom is done. In the end I did go with two 2"X12" cylinders for the bucket curl. I also got a good start on the mast diagonal braces. That should be done tomorrow. It often takes me longer to decide on a plan than to actually do it. On the bottom end, a 1/2" bolt will go through the frame and a 1/4" thick pad that will be welded to the frame and the tubing that boxes the front. Lots of meat and tie in to take the jarring.
I spent a bit of time finding a good ergonomic spot for the joystick control valve and some preliminary plumbing planning.
|