My plans for the drive belt are similar to a tiller. Using one long belt off the
PTO, through a mule drive, and builing a set of idler pulleys inbetween the bracket channels to run the belt up to the shredder pulley. Then that way I can use the mule drive to tightem/loosen the belt. If this design dosnet work well I may split the belt in two with a exchange pulley in the center of the tractor. More pics here. I mounted the screen in tonight as well.
__________________
Wendy Oaks IH Cub Cadets, Springville, IA.
|