View Single Post
  #1  
Old 01-31-2014, 04:15 PM
Sam Mac's Avatar
Sam Mac Sam Mac is online now
Administrator
 
Join Date: Feb 2010
Location: Galax VA
Posts: 18,878
Default Haban # 2 overhaul

I’m getting started on Haban #2. This is the deck that came with the 1782 that I picked up a couple months ago. It’s in pretty decent shape except for the rear hanger bracket. Looks like the PO didn’t know that the Habans are supposed to be run riding on the wheels. The bracket had been broken & welded, broken & welded at least 2 times. If you want to call the pile of poop welding. As you can see they didn't bother to remove the bracket and weld it on both sides. Now I get to grind this mess off, weld it and reinforce it. The lift control rod is also broken. No plans to replace it at this time since it serves no useful purpose with this deck. My guess is that riding around with it being the only thing hold the deck up caused a bending moment in the threads where it connects to the rock shaft. Anyway the deck is disassembled and just waiting for warmer weather so that I can sand blast it with the pressure washer sand blaster.
Attached Images
File Type: jpg IMG_3353.jpg (26.6 KB, 801 views)
File Type: jpg IMG_3354.jpg (25.8 KB, 801 views)
File Type: jpg IMG_3355.jpg (22.6 KB, 800 views)
File Type: jpg IMG_3356.jpg (20.0 KB, 797 views)
File Type: jpg IMG_3357.jpg (19.3 KB, 797 views)
__________________
2264 with 54 GT deck
1641 AKA Black Jack with a 402-E Haban Sickle bar mower
JD317 dump truck
BX2670 with FEL
Reply With Quote