View Single Post
  #10  
Old 05-22-2013, 08:46 PM
vartz04 vartz04 is offline
Senior Member
 
Join Date: Nov 2012
Location: IL
Posts: 499
Default

All the pickets are done on the 6' side all that's left over there is the gate. Also got the stringers up on the 4' side. Should be finished this week. Funny how a project the misses wants done takes 3 weeks while I'm 3 months into the 104
__________________
Cub 104 Refurbed Sprinig of 2013

Aftermarket headlights, 3 point, Brinly Adapter, Spring Assist, 42" IH Blade, 42" Mower Deck, 42" Craftsman Grader Blade, 10" Brinly Plow, 6-12 ags and 22x9.50 turfs
Reply With Quote