All the pickets are done on the 6' side all that's left over there is the gate. Also got the stringers up on the 4' side. Should be finished this week. Funny how a project the misses wants done takes 3 weeks while I'm 3 months into the 104
__________________
Cub 104 Refurbed Sprinig of 2013
Aftermarket headlights, 3 point, Brinly Adapter, Spring Assist, 42" IH Blade, 42" Mower Deck, 42" Craftsman Grader Blade, 10" Brinly Plow, 6-12 ags and 22x9.50 turfs
|