View Single Post
  #5  
Old 04-12-2012, 01:56 PM
red56turbo's Avatar
red56turbo red56turbo is offline
Grand Member
 
Join Date: Jan 2011
Location: Iowa
Posts: 2,523
Default

I snapped a couple pics of the progress. The biggest thing I'm needing is where the lever gets placed in the tunnel cover. Once I get that drilled and placed, the linkage should fall into place. So measurements or even a straight side pic would give me a ballpark idea where to place it. Also added a creeper while the rearend was out. In the last pic, you can see the battery cable clip that is giving me clearance probs. Might just have to remove that.
Attached Images
File Type: jpg allcubcadetpics 101 (Small).jpg (29.2 KB, 96 views)
File Type: jpg allcubcadetpics 102 (Small).jpg (27.0 KB, 95 views)
File Type: jpg allcubcadetpics 103 (Small).jpg (33.6 KB, 95 views)
File Type: jpg allcubcadetpics 104 (Small).jpg (27.2 KB, 94 views)
__________________
Josh

Diesel Cub Cadets...........
Reply With Quote