![]() |
125 Resto/Refurb pics
2 Attachment(s)
Before pics
|
Engine work
2 Attachment(s)
Turning crank counter balance for for add on weight --- finished engine (I will repaint the muffler silver later)
|
Bead blasting and hydro lift to rebuild
2 Attachment(s)
There was plenty of time in the blasting cabinet --- bought a 102 with hydrolift
|
Painted chassis
2 Attachment(s)
Some painting and reassembly
|
Rolling again
2 Attachment(s)
Rolling and running ----- Installed the hydro after a rebuild
|
Looks great Stephen, nice work and pics. I like your choice of ags too. Did you turn the crank and also have that B.A. Blast cabinet? My hat is off to you if you did it all, wow. How about some pics of that CJ8? All of us Jeepers drool over those scramblers too!
|
Keep up the good work, and keep the pics coming!
|
looks great, cant wait to see when youre finished
|
Looking very nice!:beerchug:
|
Doing the same with my "O".
Bead blasting/priming/painting right now.. Then I get to start putting the puzzle back together.. You do nice work! |
All times are GMT -4. The time now is 12:38 PM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.